• 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
Business?Field
Domestic?Engineering
Overseas?Engineering
EPC?Engineering
首頁>> ENGLISH>>Business?Field>>Overseas?Engineering
The Expressway Project along the Selbe River in Ulaanbaatar, Mongolia
Date:2016-11-14 Font-size:[ Big Middle Little ]

    The project is located in Ulaanbaatar, Mongolia. The overall length of theproject is 25.236km, and the whole line is new road. The viaduct-form isadopted in the main urban area while the subgrade-form is taken into usin the rest section except for the river-cross sections and interchangesections. As an expressway, the design speed of the road is 80km/h inthe main urban area while 100km/h in the suburb area. The typical widthof the subgrade is 18.6m. It’s two-way with 4 lanes and the pavement

structure adopts asphalt concrete. There are 10 interchanges, 3 aisles, 4overpasses and 23 bridges. The overall length of the bridge in mainline is4,970m. The civil and erection cost is about RMB2.35 billion。

 

 

 

单机免费打麻将单机版 燕赵福彩排列5开奖公告 股票怎样开户及开户流程 股票测评 pc蛋蛋怎么赚人民币 广东36选7中奖 最新免费体验配资 天津快乐10分高手预测 今天股票下跌原因 大发快三首页 渝三峡a股吧 吉林体彩十一选五助手 幸运28长期挂机模式 秒速牛牛规律 股价涨跌的内在原理 11选5最牛技巧 广东36选7中奖兑奖表