• 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
Business?Field
Domestic?Engineering
Overseas?Engineering
EPC?Engineering
首頁>> ENGLISH>>Business?Field>>Overseas?Engineering
Bayint Naung Bridge NO.2 Project in Myanmar
Date:2016-11-14 Font-size:[ Big Middle Little ]

    The bridge, located in Yangon Province and crossing Yangon River, is theimportant node connecting Pathein and Yangon City.The overall length ofthe bridge is 496.2m, made of 4 units of 30.8m simply-supported steel plategirder and 3 units of 122.0m simply-supported arch type steel truss, with themaximum span of 122m. 4-lane road is in the inner side of the main truss while the sidewalk outside. The total cost is about USD90 million. The project was completed, and open to traffic on November 11, 2014

单机免费打麻将单机版 河北20选5好用3开奖结果今天 黑龙江体育6十1期 股票行情 吉林快3和值推荐图 股票是跌了买还是涨 北京十一选五结果查询 有创意逗比群昵称 快乐十分每期落号教学视频 买短线股票技巧 山东11选五前三直开奖号码 私募基金配资是什么意思 两肖四码默认论坛 内蒙古11选5在线购买 江西快3走势 湖北体彩十一选五开奖 30时时乐